icl-projects

Projects

Independent Cement & Lime has supplied a variety of infrastructure projects throughout Victoria and New South Wales. The combination of quality product, technical know-how and a reliable supply chain, were pivotal to the success of these projects. A number of these iconic projects are highlighted below.

bolte-bridge

Bolte Bridge

The Bolte Bridge is one of the largest balanced cantilever cast in situ box girder bridges in Australia. The superstructure is built as two independent bridges of variable depth, pre-stressed concrete box girders, separated by a 1.15m clear gap between the structures.

READ CASE STUDY
peninsula-link-freeway

Peninsula Link Freeway

The Peninsula Link Freeway is a 27km freeway that connects the south end of EastLink to the north end of the Mornington Peninsula Freeway (that runs from Mt Martha to Rosebud), hence providing nearly 100km of motorway with no traffic lights from Collingwood to Rosebud. The freeway opened in January, 2013 and has since slashed travel times for commuters by up to 40 minutes at peak times.

READ CASE STUDY
mount-mercer-windfarm

Mount Mercer Wind Farm

The Mount Mercer Wind Farm is located at Mount Mercer in Western Victoria. The wind farm is expected to generate approximately 395,000 megawatt hours (MWh) of electricity each year which could provide enough renewable energy to power the city of Ballarat. This includes approximately 74,000 households and results in a reduction of some 510,000 tonnes of carbon dioxide.

READ CASE STUDY